Small Manufacturing ERP: how to choose the best fit (not “the best system”)

  • Writer: John Hannan
    John Hannan
  • Nov 24
  • 6 min read
John Hannan explains to a manufacturing company's receiver how to use a tablet.

If you run a small manufacturing business, you already know the common core: bills of material, routings, production orders, raw materials, inventory control, quality, and cost visibility you can actually trust—plus a price tag sized for an SMB. Those are table stakes for small manufacturing ERP. But they’re not enough to land the right system for your shop. The differences that decide success live in your industry’s quirks, your sales model, and the integrations you can’t live without.


Below I share how we approach small‑manufacturer ERP selections, what to test, and a pragmatic industry table you can use to short‑list vendors—grounded in real project work we’ve led (sanitized for anonymity).


What every small manufacturer needs from ERP

Regardless of industry, your shortlist should prove it can deliver:

  • Multi‑level BOMs and routings, MRP/MPS, outside processing, and finite capacity scheduling you’ll actually use.

  • Lot/serial traceability, quality/QMS basics, engineering change control, and production backflush options.

  • Inventory accuracy (cycle counts, scanners, warehouse/bin logic), landed cost support, and real‑time dashboards.

  • Clean financials (multi‑entity when needed), standard/actual costing with variance analysis, and quote‑to‑cash without gymnastics.

  • A realistic SMB timeline and cost profile. In our work, “small manufacturing” implementations commonly run 4–8 months end‑to‑end when scope is focused; highly regulated, multi‑system programs can take longer. (Example: one made‑to‑order vehicle builder targeted 4–6 months for phase one; a regulated aerospace manufacturer planned a phased 18–24 months program due to PLM/MES and compliance needs. )


“Small manufacturing” isn’t specific enough—industry and operating model drive fit

The table below lists industries we serve and the process differences that usually separate winners from also‑rans in a small‑manufacturer ERP selection. Use it to pressure‑test demos and to seed a balanced shortlist. The last row provides non‑exhaustive vendor examples because we know searchers want names—while still stressing that fit beats brand.

How to use this table in demos: Ask vendors to show your actual scenarios (with simplified data) and score performance against the cells that matter most for you.

Industry process differences & what ERP must prove

Industry (we serve)

Why ERP needs differ

Example ERPs to explore*

Make‑to‑Order / Configure‑to‑Order (CTO)

Product configurator, variant BOM/routings, margin by option

Acumatica · Epicor Kinetic · Infor CSI

Job Shop / Fabrication

Estimating → job, nesting/scrap, setup tracking

ProShop · JobBOSS 2 · Global Shop Solutions

Project‑Based / Engineer‑to‑Order

WBS & project cost, long‑lead buys, milestone billing

Genius ERP · Epicor Kinetic · IFS Cloud (upper‑mid)

Process / Batch (food, chem.)

Lots/expiry, recipes & yields, QA holds/recalls

Deacom (ECI) · Aptean Food & Beverage · QAD

Regulated discrete (aero/med‑device)

Serialization, full traceability, CAPA & compliance

Plex · QAD · Rootstock

Metals service centers

Length/piece inventory, slitting/cutting, toll processing

Invex · Eniteo

Apparel & soft goods

Style/size/color matrix, PLM, seasonal lines, retailer EDI

BlueCherry · Aptean Apparel

DSD / Route‑based distributors

Route accounting, DEX, mobile sales/invoicing

NCS Suite · Acumatica (+ DSD add‑ons)

Cross‑industry “generalists” (small mfg)

Broad fit; add‑ons align to niche needs

Acumatica · Epicor Kinetic · Infor CSI · D365 BC · NetSuite


Why these matter (real examples):

  • A configurable building‑products manufacturer we advised was running two disconnected QuickBooks instances plus Word/Excel for contracts, amendments and invoicing; CAD design (Revit) wasn’t connected, CRM was fragmented, and production planning was manual. Requirements had to emphasize project‑centric order flow, contract math, design handoffs, crew scheduling, and milestone billing to avoid recreating spreadsheet chaos in a new system.

  • A made‑to‑order vehicle builder (pop‑up campers) needed clean order configuration, dealer interactions, and production scheduling beyond QuickBooks/Excel; our RFP and demo scripts forced vendors to prove configuration accuracy, dealer portal options, and real‑time inventory across manufacturing and service.

  • A custom wood products manufacturer faced thousands of option combinations; we made front‑end configuration the centerpiece of the selection and then negotiated a multi‑year deal that protected value at renewal.

  • For a regulated aerospace program, ERP had to be the glue between PLM (Teamcenter) and MES (Opcenter) with multi‑site, serialized traceability—very different selection criteria than a typical SMB shop.

  • In fabricated metals, we’ve been retained to assess an under‑delivering implementation where the team struggled with setup/shrink, QMS gaps, scanning, payroll/time capture, and EDI behavior. Our role included vendor management, holding commitments to account, and introducing proven third‑party options when core features weren’t enough.


Why “just call the vendor” rarely works for small manufacturers

Every vendor will tell you their product is a great fit. That’s their job. Your job (and ours, when engaged) is to prove it against your specific requirements and risk areas.

Here’s how we run a vendor‑neutral selection for small manufacturers:

  • Requirements that reflect your shop - We interview across Operations, Engineering, Quality, Supply Chain, Finance, and Sales, then translate tribal knowledge into a structured list of business requirements—often 300–500 items—prioritized and worded so vendors can answer clearly. (Example structures and response codes are visible in our RFPs, e.g., 1=OOB, 2=light enhancement, 3=ISV, 4=significant dev, U=unknown.)

  • A disciplined RFP and demo cycle - We distribute an RFP with scope, timeline, evaluation criteria, and demo scripts; vendors get discovery Q&A, then we down‑select to a short list and run scripted demos (your data where possible) focused on the processes in the table above. See sample schedules and criteria in recent RFPs.

  • Apples‑to‑apples cost modeling - We normalize license tiers, users, modules, ISVs, integrations, and services so you see true TCO. We also coach on risk/reward terms, SLAs, and contract guardrails common to SMB programs.

  • Negotiation & implementation handoff - We manage SOW language, PRICEFW (Portals/Reports/Interfaces/Enhancements/Conversions/Forms/Workflows), and kickoff so your project starts on rails—instead of rewriting scope for months. (See our selection services overview and sample timeline.)

Results in practice: For a national, configurable building‑products company, we guided first‑time ERP stakeholders through requirements, ran a targeted RFP, then stepped back in mid‑project to map processes, advocate with the software vendor, and—when needed—help switch implementation partners without losing momentum.

What “best ERP for small manufacturing” really means

There isn’t a universal “best.” There is a best fit for your requirements, data model, and constraints. For many small manufacturers, the right answer is a mainstream platform with the right ISVs; for others, an industry‑specific solution wins on day‑one capability. Either way, the right short list only appears after you pin down the differences that matter for your industry (see the table) and make vendors prove them.


If you’re wondering where to start, a helpful rule of thumb is:

  • If most of your rows are “common SMB manufacturing,” consider Acumatica Manufacturing, Epicor Kinetic, Infor CloudSuite Industrial (Syteline), Microsoft D365 Business Central (with manufacturing), or NetSuite.

  • If your rows are dominated by regulated traceability, PLM/MES, or global multi‑site, IFS, QAD, or a scaled D365/Plex approach may surface—if your team and budget match.

  • If you are a niche like metals service centers or job shops, short‑list specialized stacks such as Invex or Eniteo (metals) and job‑shop‑focused platforms (ProShop, JobBOSS2/E2, Cetec, Global Shop).


How we can help

If you want an objective partner to pressure‑test your plan—or to lead a full, vendor‑neutral selection—we’ll bring reusable artifacts (scorecards, demo scripts, contract checklists) and the hard‑earned judgment that comes from running selections and client‑side implementations across 200+ sites. We’ve seen the movie: QuickBooks + spreadsheets + tribal knowledge, made‑to‑order complexity, and vendors who promise broadly. We’ll make the process straightforward—and defensible—so your small manufacturing ERP decision sticks.

Sources & examples from our work (sanitized)

  • An SMB building‑products manufacturer replacing two QuickBooks environments + spreadsheets; detailed challenges and goals, project timeline, and RFP structure.

  • Made‑to‑order vehicle builder (camper manufacturer) selection materials, with SMB‑appropriate schedule, evaluation criteria, and goals.

  • Custom wood products (complex option logic) case study: front‑end configuration focus and negotiation outcomes.

  • Aerospace R&D → production RFP: PLM (Teamcenter) and MES (Opcenter) integrations, serialized traceability, and phased timelines.

  • Selection process phases, timeline, artifacts we typically use in small‑manufacturer programs.

  • Fabricated metals assessment and vendor‑management excerpts: setup/shrink, QMS, EDI/scanning, and payroll/time integrations.


FAQ

What’s the “best ERP for a small manufacturing business”?

  • The one that best fits your specific requirements—especially the cells in the table where your risks concentrate. We routinely put Acumatica, Epicor Kinetic, Infor CSI, Microsoft D365 BC (with manufacturing), and NetSuite on SMB short lists, but niche options and ISVs often change the answer.

How long does ERP take for small manufacturers?

  • Focused SMB programs often run 4–8 months from kickoff to go‑live; highly regulated or multi‑system programs can run 12–24 months with phasing.

What’s the fastest way to narrow the field?

  • Turn your top 30–50 differentiating requirements into a demo script, then make vendors show them with your simplified data. Score what you see—not what you’re told. (We can share sample RFPs, scoring models, and demo scripts.)


Ready to define your “best fit” ERP for small manufacturing?

Send one paragraph on your products, order model, and top 5 pains. I’ll reply with a calibrated short list and a one‑page demo script to get you started—no vendor bias, just a practical way to move from guessing to knowing.

Popular Articles

CONTACT US

By submitting this form, you agree to our Privacy Policy.

Thanks for your submission.

(856) 952-2632

Lake Ariel, PA  |  Philadelphia, PA

  • twitter
  • linkedin

©2024 by John Hannan LLC

bottom of page